Galaxy Dry Dock Refurbishment
Contract Title Galaxy - Name change to Mein Schiff
Location & Date Lloyd Werft Bremerhaven, April 2009 – May 2009
Client MML Shipbuilding OY
Scope of Works Our Demolition team joined the vessel in Puerto Rico and sailed across the Atlantic Ocean demolishing our deck 12 observation lounge. This large area was then split into 3 different zones including a Night club, Chill Zone and a VIP lounge. Our scope included decorating throughout including spray painting all columns and deck head, flooring throughout with some very intricate wood strip, Corian tables & bar counters, re-upholstery of all banquettes and soft furnishings, Glass partitions and Stainless steel fabrication to name some of the work. We transported our mobile workshop and a storage container to Germany which we used for the duration of the refit.
.

BluMarine tradesman and apprentice fitting new Dampa deckhead support grid and panels to main lounge

Finished quite lounge on starboard side deck 12. Sandy beach effect carpet. Furniture manufactured in our Salisbury workshops and upholstery completed by our fitters on-board.

BluMarine completed the cocktail bar using specialist wall covering by Muraspec and "surfboard" styled high tables manufactured in our Salisbury workshops using Corian products and stainless steel mouldings.

BluMarine refurbished the dance floor and seating area using specialist sanding equipment and upholsterers from our Salisbury workshops. Wave effect vinyl tiles imported from China.

One of the more unusual design requests. Hanging bubble chairs on deck 12 port side. (not to be used in the event of high seas !!)

View of the finished lounge bar. Wave effect flooring carpet to contrast with other sand effect carpet in lounge. Bar top finished in Italian stone and bar front clad with West African hardwood blocks machined to different thicknesses to maintain wave effect.

Entrance to the cocktail bar deck 12. Pin head LED lighting set behind blue epoxy coated stainless panels with overhead LED light to highlight the metal flake particles in the epoxy coating. All spray paint work carried out on-board with careful screening of other completed areas. Wood effect flooring fitted throughout area by our specialist flooring sub-contractor Global Marine Interiors.

An example of the dry dock upholstery and flooring work carried out by BluMarine on the Galaxy Project. To the left of the photogragh (one of 14 pillars in the project) has been spay painted in position using an airless spray technique. The specialist "cast" coloured glass partitions to the right were also supplied and fitted by BluMarine.