Carnival UK – Azura Refit
• 1000sqm’s of vinyl floor replacement
• French polishing through the ship
• Leather works
• Fabric maintenance & cleaning
• Astro turf replacement
• Upholstery works in public areas
• Joinery works in the restaurants and throughout
• Sound insulation in cabins
• Dance floors throughout were re-furbished
The project was completed 3 days ahead of schedule which enabled the client to award Blu Marine with additional works on-board, all of which were completed within the original completion date. Apart from a small riding team, all our personnel disembarked in Hamburg before the sail back to Southampton allowing the ship staff adequate time to get ready for welcoming passengers onboard once back in Southampton. Overall the project was a complete success and the Client was very pleased with the final result.