A huge well done to the Blu Marine team that worked onboard the Pearl Seaways in March 2017.
The works which were done in service while the ship sailed between Copenhagen and Oslo, involved stripping out the existing beds and pull down bunks before installing new double occupancy beds made from non-combustible material, each bed included both a drawer for storage and an under bed suitcase compartment. Each of the 50 beds were manufactured in our Limavady workshop and flat-packed for shipping to Copenhagen where the team joined the ship and completed the works in 6 days with minimum disruption to the passengers. Each headboard now has inbuilt sockets and switches as well as an LED lighting strip. The DFDS Copenhagen Fleet now have 3 ships that have benefitted from these unique beds, the upgrade is very popular with the passengers and we look forward to continuing to work with the DFDS team to install further beds in the near future.
Well done everyone involved and a special thank you to the crew onboard the Pearl Seaways.