Discovery

Our scope of works was to refurbish the outside swimming pools over a two week period onboard. We came up with a scheme to remove the existing tiles and clad the outside and top of the pools in Iroko Hardwood. The pools were grit blasted and painted using a specialist pool paint and as a finishing touch we hand painted the ships logo on the pool floor. The Iroko came to us from our local saw mill and was machined from rough form to workable sizes. We further machined the wood and made up sections of the pool top sections which were marked up and packed in our container. The pictures show the transformation but they don’t show the background preparation work which was paramount to such a finish.